%0 Conference Paper
%A Böhme, C.
%A Bekman, I.
%A Kamerdzhiev, V.
%A Lorentz, B.
%A Merzliakov, S.
%A Simon, M.
%A Weidemann, C.
%T COSY Orbit Control Upgrade
%N TUPCF20
%M FZJ-2018-02873
%M TUPCF20
%D 2017
%X The Cooler Synchrotron COSY can store and deliver protonand deuteron beam in the momentum range from 0.3GeV/c to 3.65 GeV/c for internal and external experiments.New requirements of the Jülich Electric Dipole MomentInvestigation (JEDI) experiment requires a RMS beam orbitdistortion smaller than 100 µm. This requirement lead so farto the replacement of the BPM readout electronics, an introductionof a slow beam orbit correction and feedback systemand the re-alignment of the magnets. All three projects areclose to completion, therefore first results are presented.
%B 2017 International Beam Instrumentation Conference
%C 20 Aug 2017 - 24 Aug 2017, Grand Rapids (USA)
Y2 20 Aug 2017 - 24 Aug 2017
M2 Grand Rapids, USA
%F PUB:(DE-HGF)29 ; PUB:(DE-HGF)24
%9 ReportPoster
%U https://juser.fz-juelich.de/record/845657