Contribution to a conference proceedings (Other) FZJ-2016-01720

http://join2-wiki.gsi.de/foswiki/pub/Main/Artwork/join2_logo100x88.png
Upgrade of the Beam Profile Monitoring System in the Injection Beam Line of COSY

 ;  ;  ;  ;  ;  ;

2015

IBIC 2015, IBIC 2015, FZ JülichMelbourne, FZ Jülich, Australia, 13 Sep 2015 - 17 Sep 20152015-09-132015-09-17 344-346 ()

Please use a persistent id in citations:

Abstract: The cyclotron Julic is used as an injector for the COSY synchrotron and storage ring of 183 m circumference. The 93 m long injection beam line (IBL) transports polarized and unpolarized H-/D- ions which are injected into the ring via multi-turn stripping injection. 8 profile monitoring stations are installed in the IBL. Each station contains two harps having 39 wires at 1mm spacing. Each harp is read out by a multichannel pico-amperemeter module designed by iThemba LABS, South Africa, delivering profile data to the COSY control system. The technical details of the upgrade and recent beam profile measurements are presented.

Keyword(s): Particle Physics (2nd)


Contributing Institute(s):
  1. Kernphysikalische Großgeräte (IKP-4)
Research Program(s):
  1. 631 - Accelerator R & D (POF3-631) (POF3-631)
Experiment(s):
  1. Detectors/Electronics

Appears in the scientific report 2016
Database coverage:
Creative Commons Attribution CC BY 3.0 ; OpenAccess
Click to display QR Code for this record

The record appears in these collections:
Dokumenttypen > Ereignisse > Beiträge zu Proceedings
Institutssammlungen > IKP > IKP-4
Workflowsammlungen > Öffentliche Einträge
Publikationsdatenbank
Open Access

 Datensatz erzeugt am 2016-02-24, letzte Änderung am 2021-01-29


OpenAccess:
Volltext herunterladen PDF
Externer link:
Volltext herunterladenFulltext by OpenAccess repository
Dieses Dokument bewerten:

Rate this document:
1
2
3
 
(Bisher nicht rezensiert)