| Hauptseite > Publikationsdatenbank > Safety problems in the Julietta capacitor bank |
| Book/Report | FZJ-2017-04138 |
;
1968
Kernforschungsanlage Jülich, Verlag
Jülich
Please use a persistent id in citations: http://hdl.handle.net/2128/14685
Report No.: Juel-0540-PP
Abstract: In 1967 the capacitor bank was extended to an energy of 1,2 MJoules and a crowbar system has been installed. A survey of the bank characteristics and of the safety principles which were followed is presented. The probability of breakdowns in a system where currents of some 10 MA are flowing was decreased by dividing the bank and the collector, which is of the multi-plate type, in elements. The danger resulting from prefiring and misfiring of start-gaps has been eliminated by charging rapidly the master-trigger generator at theend of the charging cycle and by increasing the corresponding capacity. Initially, a rather complicated electronic current monitoring system was installed. The reliable operation of the start-gaps allowed one to simplify later the set-up: the potential differences between units are followed, indicating directly the location of the eventually defective start-gap. Each crowbar-gap was provided with a fast acting current-detector. When a prefire occurs, all the remaining crowbar-gaps are triggered almost instantaneously. By keeping the transit times as short as possible, the delay has been reduced to 1 $\mu$sec. Defects in the electronic master control system could lead to a misfire of the whole crowbar system and eventually to the destruction of the discharge tube. A second slightly slower trigger path, using delay lines and spark-gaps exclusively, was built in. The charging voltages of spark-gaps and thyratrons in the crowbar trigger system are monitored: if they are missing, a blocking signal is transmitted into the master control system.
|
The record appears in these collections: |